Skip to content

Free tools/Production & IE

Machine Requirement Calculator

Machines of one type needed for a target, from that machine type's share of the SMV.

Machines needed

7

Exact requirement

6.51

The formula

Machines = target x machine-type SMV / (working minutes x efficiency), rounded up.

Worked example

Target per day: 1000 pcs, SMV on this machine type: 2.5 min, Working minutes per day: 480 min, Expected efficiency: 80 %. Result: Machines needed = 7; Exact requirement = 6.51.

Assumptions

  • Run per machine type (lockstitch, overlock, flatlock) with that type's summed SMV.

Read the guide

In the platform

Intelactory computes line efficiency from the output and attendance each line records, and forecasts capacity conflicts across lines and factories.

More Production & IE tools